Burnham Boiler 105133-03 Vent Assembly

Burnham Boiler 105133-03 Vent Assembly

Burnham Boiler

  • $730.00


The Burnham Boiler 105133-03 Vent Assembly is the 4 x 4 two pipe connector assembly for PVC venting on Burnham boiler installations that need the larger connection pair. A two pipe boiler depends on one run to bring in combustion air and a second run to carry flue products outdoors. The connector assembly is the transition between the appliance and those runs. If it leaks, corrodes or loses its grip on the pipe, you can end up with exhaust in the mechanical room, condensate where it does not belong or combustion that drifts out of adjustment.

This assembly is built as a metal plate with two round collars, each fitted with a band clamp. A loose black gasket ring and a packet of Molykote 111 compound come with it, giving the installer what is needed to seal and lubricate during assembly. The matching family includes 105133-01 in a 3 x 3 size and 105133-02 in a 3 x 4 combination, and those three numbers are easy to confuse on a parts order. Check the existing assembly and the boiler installation manual to be certain the 4 x 4 configuration is the one your equipment requires.

Before removal, turn off power and gas and support the connected piping so its hanging run does not strain other joints. Inspect the mating surface on the boiler and clean away old residue. Position the gasket as shown in the installation instructions, apply the compound only where those instructions call for it, and fasten the plate evenly. Insert each pipe to full depth, tighten the clamps and confirm that horizontal runs slope as the venting section requires. Do not substitute solvents or lubricants that could attack the seals. After restarting the boiler, check all joints for leaks, verify that condensate drains properly and complete a combustion analysis before leaving the job.

Key Benefits

  • Larger Port Pair: The 4 x 4 configuration serves installations designed for the bigger vent and combustion air connections.
  • Sealing Items Supplied: A black gasket ring and Molykote 111 compound arrive with the assembly, so the joint can be put together correctly the first time.
  • Secure Pipe Retention: A band clamp on each collar holds the piping and lets a technician loosen it for inspection or future service.
  • Fixed Port Layout: One plate carries both collars, which keeps the two connections aligned at the boiler and tidies up the transition to field piping.

Common Questions

  • How is 105133-03 different from the other sizes? This number is the 4 x 4 assembly. 105133-01 is 3 x 3 and 105133-02 is 3 x 4. Order by the sizes your boiler manual specifies.
  • What is the compound packet for? Molykote 111 is a silicone compound used to lubricate and seal. Apply it only to the points identified in the installation instructions.
  • When should a vent connector be replaced? Replace it if you find corrosion, cracks, warping, damaged seals, failed clamps or any evidence of flue gas or condensate escaping at the connection.

Disclaimer: While we strive for 100% accuracy, product data and specifications are subject to change. Please contact our team to confirm compatibility or technical details before purchasing.